Northwick Park to Preston Green, London Underground

Northwick Park to Preston Green

MLM undertook site investigations as part of London Underground periodic checks on their above ground assets including embankments, cuttings and structures. Work involved trial pitting, window sampling, instrumentation and monitoring together with laboratory testing and reporting. Work was undertaken during engineering hours on trackside locations.


Download a PDF project sheet