Martin Liddell,
Director (Structures Division)

As a Director of the MLM Structures Division, Martin leads the Structures teams in the Ipswich and Norwich offices. ...
Material Recycling Facility and AWT Plant, Rainham

- Client: Cleanaway Limited
- Architect: -
- Market Sector: Waste
- Services: Environmental
MLM Environmental were appointed by Cleanaway Limited to assess the foundation options available for constructing a large Material Recycling Faciity and Transfer Station on an old landfill site at Rainham, Essex.
Ground conditions were extremely poor with very loose saturated wastes overlying peat and clay. Settlements due to surface loading from the plant inside the building and consolidation due to leachate extraction of the site warranted a raft foundation solution which minimised and eliminate unacceptable settlements.
MLM designed and undertook the site investigations, instrumentation and monitoring, together with geotechnical analysis and raft design.
Services provided:
- Cable tool and cone penetration testing.
- Extensometer and inclinometer installation.
- Pneumatic prezometer installation.
- Geotechnical analysis.
- Finite element analysis.
- Raft design.
Other Waste Projects: | view all
Household Waste Recycling Centre
Greenwich
Rainham MRF & AWT Plant
Rainham, Essex
Lackford Composting Facility
Suffolk
Materials Recycling Facility
Greenwich
Waterbeach Landfill
Cambridgeshire
Waste Transfer Station
Hinckley









