Hale Village, London

Hale Village

Infrastructure design works (drainage) serving a mixed use development of approximately 2,000 dwellings, 4,500 m2 of retail space plus other community facilities. The design has been undertaken to Section 104 adoptable standards and will be offered as asset to Scottish and Southern Water upon completion.

Using CSC’s latest 3D modelling package Orion, this enabled the design team to apply a fast-track design programme and the rapid production and exchange of information.

Key Features

  • Main adoptable sewers.
  • Balancing/attenuation facilities with controlled surface water discharge to adjacent watercourse (Pymmes Brook).
  • Upgrade to existing (off-site) Foul Water pumping station.


Download a PDF project sheet


Other Retail Projects: | view all

Caspian Wharf

Caspian Wharf
Bow, London

Apple Store, Shop Fit Out

Apple Store, Shop Fit Out
Various locations

Hotel Chocolat Stores Ltd

Hotel Chocolat Stores Ltd
Various Locations

Mamas and Papas

Mamas and Papas
West London Store