Bridge 404, River Gipping, Ipswich

- Client: Kier Rail
- Architect: -
- Market Sector: Rail
- Categories: Bridges & Retaining Walls, Temporary Works & Surveys
- Services: Civil Engineering
MLM were commissioned by Kier Rail to provide GRIP 4 & 5 design services for a bridge bearing replacement and deck refurbishment and repair scheme for a 3 span steel structure spanning the River Gipping in Ipswich.
MLM carried our detailed site investigations including trackside attendance under T3 possession and soffit/beam/pier/abutment inspection from a stable barge in the river.
Following our inspection MLM identified a fundamental structural mechanism failure due to a lack of longitudinal restraint under train breaking or accelerating loads. Whilst bearing replacement and steelwork repair details were developed to Form A and B stages, MLM advised Network Rail of the greater principal issues for review and further consideration.
Other Rail Projects: | view all
Wellingborough East Railway Bridge
Route 4, Wellingborough
Enterprise House
Paddington, London
Retaining Wall Inspection
Drayton Park, London
Northwick Park to Preston Green
London Underground
Letchworth Station Platform Extensions
Hertfordshire
Balmoral Road
East Ham, London