Bridge 404, River Gipping, Ipswich

Bridge 404

MLM were commissioned by Kier Rail to provide GRIP 4 & 5 design services for a bridge bearing replacement and deck refurbishment and repair scheme for a 3 span steel structure spanning the River Gipping in Ipswich.

MLM carried our detailed site investigations including trackside attendance under T3 possession and soffit/beam/pier/abutment inspection from a stable barge in the river.

Following our inspection MLM identified a fundamental structural mechanism failure due to a lack of longitudinal restraint under train breaking or accelerating loads. Whilst bearing replacement and steelwork repair details were developed to Form A and B stages, MLM advised Network Rail of the greater principal issues for review and further consideration.


Download a PDF project sheet


Other Rail Projects: | view all

Wellingborough East Railway Bridge

Wellingborough East Railway Bridge
Route 4, Wellingborough

Enterprise House

Enterprise House
Paddington, London

Retaining Wall Inspection

Retaining Wall Inspection
Drayton Park, London

Balmoral Road

Balmoral Road
East Ham, London