MLM were commissioned to carry out a principal inspection of a 10m wrought iron beam structure with cast iron transverse spanning buckle plates at Balmoral Road, East Ham, London.

The inspection was to address issues raised from previous assessment work by others and to resolve previous assumptions. Following our inspection we produced a feasibility report recommending Finite Element Analysis for the buckle plates, this was carried out and showed that the buckle plates would indeed pass an assessment to BE4 (subject to exact construction). However, further more detailed intrusive inspections found previously hidden damage to sections of the structure resulting in a joint decision with Network Rail to close the bridge.

We then carried out a detailed design, through the GRIP 4 - Form A and GRIP 5 - Form B process, for a reinforced concrete overslab scheme, revised carriageway vertical alignment and wrought iron beam repairs to allow the bridge to re-open.


Download a PDF project sheet


Other Rail Projects: | view all

Retaining Wall Inspection

Retaining Wall Inspection
Drayton Park, London

Wellingborough East Railway Bridge

Wellingborough East Railway Bridge
Route 4, Wellingborough

Enterprise House

Enterprise House
Paddington, London