Paul Eggleton,
Director (Building Control)

Paul

Paul is a Director of MLM Building Control, who uses his twenty years experience and creative skills to take an innovative approach to problem solving...

View Paul's profile
Other people

Anglian Water, Corby

Anglian Water

Anglian Water Group are disposing of land to their core business, which lies adjacent to the existing treatment works at Corby. The site will either be developed by AWG or sold with a proposed end use for waste management or related industry. The site has a previous industrial usage but has effectively returned to nature, becoming heavily overgrown with major ecological potential.

MLM were employed to undertake a range of services to assist in identifying constraints and opportunities to development of the site. This included a feasibility study of transport, flood, engineering, ecology and contaminated land issues and this has led to further more detailed works specifically in relation to Ecology and Contaminated land. Reports produced will be used to assist in marketing of the site and in future planning applications.

Services included:

  • Feasibility stage transportation and utilities assessments.
  • Flood Risk Assessments.
  • Phase 1 geotechnical, contaminated land and ecological assessments.
  • Contaminated land site investigations and assessments.
  • Phase 1 habitat and biodiversity surveys.
  • Bat, badger and reptile surveys.
  • Habitat mitigation strategy.
  • Developments constraints report.


Download a PDF project sheet


Other Sustainability Projects: | view all

Longstanton Exhibition Centre

Longstanton Exhibition Centre
Longstanton Park & Ride